Optimasi Perencanaan Jadwal Konstruksi Proyek Engineering, Procurement, dan Construction Dengan Metode Advanced Work Packaging

Mardiana, Ghina (2018) Optimasi Perencanaan Jadwal Konstruksi Proyek Engineering, Procurement, dan Construction Dengan Metode Advanced Work Packaging. Bachelor thesis, Podomoro University.

[img]
Preview
PDF (Cover)
Cover-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (277kB) | Preview
[img]
Preview
PDF (Surat Bebas Plagiat)
Bebas-Plagiat-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (719kB) | Preview
[img]
Preview
PDF (Halaman Pengesahan)
Pengesahan-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (135kB) | Preview
[img]
Preview
PDF (Kata Pengantar)
Kata Pengantar-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (340kB) | Preview
[img]
Preview
PDF (Halaman Pernyataan Persetujuan Publikasi)
Persetujuan Publikasi-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (413kB) | Preview
[img]
Preview
PDF (Abstrak)
Abstrak-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (270kB) | Preview
[img]
Preview
PDF (Daftar Isi)
Daftar Isi-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (442kB) | Preview
[img]
Preview
PDF (Daftar Gambar)
Daftar Gambar-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (255kB) | Preview
[img]
Preview
PDF (Daftar Tabel)
Daftar Tabel-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (249kB) | Preview
[img]
Preview
PDF (Daftar Lampiran)
Daftar Lampiran-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (254kB) | Preview
[img]
Preview
PDF (Daftar Singkatan)
Daftar Singkatan-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (698kB) | Preview
[img]
Preview
PDF (Bab 1)
Bab 1-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (371kB) | Preview
[img] PDF (Bab 2)
Bab 2-Proyek Akhir-22140013.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB) | Request a copy
[img] PDF (Bab 3)
Bab 3-Proyek Akhir-22140013.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (450kB) | Request a copy
[img] PDF (Bab 4)
Bab 4-Proyek Akhir-22140013.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (635kB) | Request a copy
[img] PDF (Bab 5)
Bab 5-Proyek Akhir-22140013.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB) | Request a copy
[img] PDF (Bab 6)
Bab 6-Proyek Akhir-22140013.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (257kB) | Request a copy
[img]
Preview
PDF (Daftar Pustaka)
Daftar Pustaka-Proyek Akhir-22140013.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (305kB) | Preview
[img] PDF (Lampiran)
1A_WBS.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (266kB) | Request a copy

Abstract

EPC is a form of contract agreement that is dominant in the construction industry for infrastructure development. EPC is known for its many work items and must be carried out simultaneously between the design, procurement and construction processes. With the work process carried out concurrently this results in a duration that must be carefully calculated so as not to delay, while the nature of the construction work is only temporary. One of the problems in the EPC type industrial sector is that there is poor management of time. A planner must be able to take into account the duration and number of skilled workers and labor in the construction field and at the head office. For that reason, this study discusses the use of the AWP method during the construction planning period which is closely related to the increase in labor productivity. The application to achieve this is used causal-comparative method. To achieve this, we use the method of grouping project work packages and the relationships between jobs between traditional methods and the AWP method. From the results of research that has been carried out in terms of duration estimation, the relationship between work items, and WBS it turns out that the application of the application using the AWP method in the construction planning phase is considered in accordance with several studies from literature studies. These results indicate the effectiveness of several work items and the duration of the project. It is expected that the use of comparative causal methods between traditional methods and AWP can prove one of the solutions to problems that occur in the construction planning phase.

Item Type: Skripsi (Bachelor)
Uncontrolled Keywords: penjadwalan, fase perencanaan, Advanced Work Packaging
Subjects: Construction Engineering and Management
Faculty: - Construction Engineering and Management
Depositing User: Users 57 not found.
Date Deposited: 01 Oct 2018 09:23
Last Modified: 18 Jan 2020 03:24
URI: http://repository.podomorouniversity.ac.id/id/eprint/95

Actions (login required)

View Item View Item